CH₄ and CO₂ detection for Biowanze’s new biomass facilities

For a project involving a new biomass steam boiler and pellet storage silo, Biowanze called on Dalemans to define the gas detection requirements for the new buildings.

The challenge was to establish a configuration that would protect people and infrastructure from the risks associated with methane (CH₄) and carbon dioxide (CO₂).

The project began while the buildings were still under construction. This meant designing the gas detection system for facilities that were not yet operational. Before selecting the equipment, Dalemans first needed to understand the layout of the future buildings, how they would operate and how people and processes would move through them.

Sizing the gas detection system around actual requirements

To define the right configuration, the Dalemans team combined an on-site visit to the construction area with an analysis of the building plans.

“We carried out an on-site visit to the construction area, but we also worked from the plans to perform a needs analysis and a workflow study for the future production building,” explains François Spadazzi, Sales Engineer at Dalemans.

This assessment established the number of systems required and the areas that needed gas detection coverage. Identifying CH₄ and CO₂ as the gases to be monitored then guided the choice of detection technologies, taking into account the different detection requirements associated with each gas.

Dalemans specified the detectors and control panels based on the gases involved, the specific site conditions and the applicable standards.

From equipment selection to on-site integration

Sizing a gas detection system goes beyond selecting the detectors. Their positioning and connection also need to be consistent with the system defined during the engineering phase.

Dalemans therefore worked alongside the electricians during installation, providing guidance on equipment positioning and cable selection.

This ensured continuity between the initial assessment and the system installed on site, while maintaining the technical choices defined for the new buildings.

A SMART solution

Once construction was complete, Dalemans carried out the required checks before commissioning. The as-built documentation recorded the final system configuration, while a tailored maintenance plan was established for its ongoing upkeep.

The project formed part of a relationship between Biowanze and Dalemans spanning more than fifteen years. Since 2009, Dalemans had already supplied equipment for eight gas detection systems and maintained eleven complete installations across the site.